Monday, August 20, 2018

Moving Along

The first and third walls here will be replaced (too many repairs needed). The center wall is one I was able to save.

Finally...

Finally we have been able to start moving onto another room in the house. We are tackling the bedroom next ours which is a room I love because it is so bright. It had charming yellow flowered wallpaper in it. However, it still needed to come down due to it being old and worn. The color yellow really did this room justice though and so we have plans to stay with that color when we paint. I patched one of the walls that had a big gouge in the plaster. To my amazement, I did a pretty good job. We will now need to replace only two walls and the ceiling. This was decided of course after I took down the wallpaper. While I was stripping wallpaper, I decided to go ahead and do the next room as well. Greg had started to tear this room apart in the very beginning and used it to access the pipes for the bathroom which is right next door.  This room had paneling, wallpaper and acoustic ceiling tiles in it. Now, it too is almost ready for repairing the walls or adding new ones.

Piles of stripped wallpaper.

This wall will be replaced.

Scraping off wallpaper.

Greg's bathroom pipes.

Almost ready to do wall repairs in room #3.

Stay tuned for how these rooms clean up.

2 comments: